Search Capital Construction Projects

Construction information for current and upcoming Capital Projects:

 
Map
68-70 BROOKSTREAM COURT SLOPE STABILIZATION AND PRIVACY BARRIER
$500,000.00
designservices@hamilton.ca
Map
Road and sidewalk reconstruction
Sanitary Service Lateral Replacements
Storm Collection System Expansion
Water System Distribution Replacement
Coco Paving Inc
Jul 31, 2022
Aug 2022 - Sep 2023
$9,048,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Culvert Rehabilitation
Apr 2022 - Sep 2022
$200,000.00
designservices@hamilton.ca
Map
BRIDGE REHABILITATION
Bronte Construction
Jul 11, 2022
Sep 29, 2022
$156,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Apr 2022 - Sep 2022
$200,000.00
designservices@hamilton.ca
Map
Culvert Rehabilitation
$950,000.00
designservices@hamilton.ca
Map
CULVERT REHABILITATION
Jul 2023 - Nov 2023
$844,000.00
designservices@hamilton.ca
Map
Culvert Replacement
May 2023 - Nov 2023
$70,000.00
designservices@hamilton.ca
Map
Bridge Rehabilitation
Jul 2022 - Mar 2023
$1,622,000.00
designservices@hamilton.ca
Map
Bridge Rehabilitation
Coco Paving Inc
May 9, 2022
Aug 29, 2022
$672,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Culvert Rehabilitation
Urbanlink Civil Ltd.
Jan 2023 - Oct 2023
$558,000.00
designservices@hamilton.ca
Map
GOVERNOR'S RD From START OF BRIDGE To END OF BRIDGE (45 meters east of OGILVIE ST)
Road and sidewalk reconstruction
Bridge Rehabilitation
Sanitary Sewer Pipe Bridge Rehab
Water Distribution System Replacement
$4,470,000.00
designservices@hamilton.ca
Map
Bridge Rehabilitation
Apr 2023 - Sep 2023
$1,120,000.00
designservices@hamilton.ca
Map
Culvert Replacement
Jun 2023 - Nov 2023
$71,000.00
designservices@hamilton.ca
Map
BRIDGE REHABILITATION
Decew Construction Inc.
Aug 2, 2022
Oct 28, 2022
$805,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Culvert Replacement
Decew Construction Inc.
Aug 2, 2022
Oct 28, 2022
$1,080,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road resurfacing
Rankin Construction Inc.
Sep 27, 2022
Sep 2022 - Aug 2023
$466,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road resurfacing
$2,000,000.00
designservices@hamilton.ca
Map
Road resurfacing
Associated Paving & Materials Ltd.
May 11, 2022
Jul 29, 2022
$300,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road resurfacing
Associated Paving & Materials Ltd.
Jun 6, 2022
Oct 26, 2022
$767,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road resurfacing
Rankin Construction Inc.
Sep 2022 - Aug 2023
$300,000.00
designservices@hamilton.ca
Map
Road rehabilitation
Rankin Construction Inc.
Sep 2022 - Aug 2023
$280,000.00
designservices@hamilton.ca
Map
Road resurfacing
Associated Paving & Materials Ltd.
Jun 6, 2022
Oct 26, 2022
$511,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road reconstruction
Sewer Service Line Replacement
Watermain Replacement
$1,235,000.00
designservices@hamilton.ca
Map
Road reconstruction
Sanitary service line replacement.
Watermain replacement.
$2,540,000.00
designservices@hamilton.ca
Map
Road rehabiltation
Coco Paving Inc
Sep 6, 2022
Nov 1, 2022
$1,611,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road resurfacing
Green Infrastructure Partners Inc. (GIP)
Nov 2022 - Sep 2023
$1,206,000.00
designservices@hamilton.ca
Map
Road rehabilitation
KING Paving & Construction (KPM Industries Ltd.)
Oct 2022 - Nov 2022
$184,000.00
designservices@hamilton.ca
Map
Road rehabilitation
KING Paving & Construction (KPM Industries Ltd.)
Oct 2022 - Nov 2022
$918,000.00
designservices@hamilton.ca
Map
Road rehabilitation and bike blvd pilot
Bike blvd
Associated Paving & Materials Ltd.
Oct 11, 2022
Oct 2022 - Jul 2023
$679,100.00
constructionservices@hamilton.ca
Customer Survey
Map
Road reconstruction
Watermain Upgrade
$935,000.00
designservices@hamilton.ca
Map
Road resurfacing
Rankin Construction Inc.
Sep 6, 2022
Sep 2022 - Nov 2022
$452,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Mill to approximately 80mm depth and replace asphalt: Breadalbane from King St. to Jones St. Jones St. from Breadalbane to Woodbine Cres. (~50m) Concrete repairs as required along section of resurfacing only.  
Bike Blvd
Associated Paving & Materials Ltd.
Oct 2022 - Dec 2022
$725,000.00
designservices@hamilton.ca
Map
Road resurfacing
KING Paving & Construction (KPM Industries Ltd.)
Aug 15, 2022
Aug 2022 - Dec 2022
$1,219,000.00
constructionservices@hamilton.ca
Customer Survey
Sidewalk repairs
A.Cosmos Concrete and Paving
Jun 2022 - Sep 2023
$270,000.00
designservices@hamilton.ca
Map
Road rehabilitation and pedestrian facility enhancements   Limits: Concession St / Mountain Brow Blvd, from Upper Gage to Upper Ottawa: - reconstruct road in coordination with required concrete curb replacement and sidewalk/pathway installation Mountain Brow Blvd, from Upper Ottawa, through and including traffic circle, to Oakcrest Ave: - deep mill (approx. 80mm) and resurface, in coordination with required concrete curb repairs/replacement and sidewalk/pathway installation Transportation Planning - General scope:  Concession St. is a designated truck route which supports goods movement to Concession St. BIA and to the hospital. The road structure design should account for heavy loads. The select design vehicle for this corridor could be WB-19 or WB-20 at max. Transportation Planning - Mobility scope: The CMP identifies bicycle lanes on this roadway segment westerly of Upper Ottawa. Therefore include these on-street bicycle lanes in the updated pavement marking design and extend pavement marking design two additional blocks west of Upper Gage to Mountain Park Ave. These bicycle lanes should fit on the existing roadway platform.Cycling staff are in the process of getting Councillor support for this initiative. Transportation Operations and Maintenance - Transportation Systems scope:  During functional review it was identified that traffic analysis will be required for the Upper Ottawa traffic signal Traffic analysis of the current traffic circle shows excess capacity. Any proposed road narrowing to install active transportation facilities (as noted in transportation planning scope) will however affect the ability of this access to be used as detour route during planned/unplanned events on the LINC/Sherman Cut/ Claremont Tra
Sanitary Lateral Replacement
Retaining Wall Decommissioning
Full Watermain Replacement
$7,650,000.00
designservices@hamilton.ca
Map
WILSON ST W From PORTIA DR To MCCLURE RD (Wilson West Traffic Circle: Portia Drive & McClure Road Intersections)
Install Pedestrian Crossover (PXO) 'Type C' & 'Type D': Wilson Street West Roundabout & Portia Drive & McClure Road   Installation of 4 'Type C' PXO's & 4 'Type D' PXO's at the Traffic Circle
Decew Construction Inc.
Jul 5, 2021
May 2021 - Dec 2022
$75,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Construct Pedestrian Crossover (PXO) 'Type B' : Van Wagner Beach Rd & Barangas
Associated Paving & Materials Ltd.
Aug 3, 2021
Aug 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
BINBROOK RD From GREAT OAK TR To GREAT OAK TR
Install Pedestrian Crossover (PXO) 'Type B': Binbrook Road & Great Oak Trail
Decew Construction Inc.
Jul 5, 2021
Jul 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
GREEN FOREST DR From KING ST E To KING ST E
Install Pedestrian Crossover (PXO) 'Type B': King Street East & Green Forest Drive
Associated Paving & Materials Ltd.
Aug 3, 2021
Aug 2021 - Dec 2022
$25,000.00
constructionservices@hamilton.ca
Customer Survey
Map
LONGWOOD RD S From MARION AVE S To MARION AVE S
Install Pedestrian Crossover (PXO) 'Type B': Longwood Road & Marion Avenue
Decew Construction Inc.
Aug 2022 - Dec 2022
designservices@hamilton.ca
Map
WENTWORTH ST N From MARS AVE To MARS AVE
Install Pedestrian Crossover (PXO) 'Type B': Wentworth Street North & Mars Ave
Associated Paving & Materials Ltd.
Aug 3, 2021
Aug 2021 - Dec 2022
$40,000.00
constructionservices@hamilton.ca
Customer Survey
Map
JERSEYVILLE RD W From MEADOWBROOK DR To LLOYMINN AVE S (In front of Ancaster High)
Install Pedestrian Crossover (PXO) 'Type C': Jerseyville Road & Ancaster High
Decew Construction Inc.
Jul 5, 2021
Jul 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
Construct Pedestrian Crossover (PXO) 2x 'Type D' & 'Type B': King Street & Paradise Road
Associated Paving & Materials Ltd.
Aug 3, 2021
Aug 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
CONCESSION ST From EAST 33RD ST To EAST 33RD ST
Install Pedestrian Crossover (PXO) 'Type B': Concession Street & East 33rd
Decew Construction Inc.
Jul 5, 2021
May 2021 - Dec 2022
$30,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Installation of a Pedestrian Crossover (PXO) - Type B - Nibset Blvd & Bobcock St.
Decew Construction Inc.
Jul 5, 2021
May 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
WILSON ST W From SHAVER RD To SHAVER RD
Installation of a PXO on Wilson Street W & Shaver Road. "Type C" for Wilson Street, "Type D" for Shaver Rd
Decew Construction Inc.
Aug 2022 - Dec 2022
designservices@hamilton.ca
Map
Construct Pedestrian Crossover (PXO) Underground at Mountian Brow Boulevard & Ellsworth Drive to support PXO upgrade to include flashers and AODA features. 
Decew Construction Inc.
Jul 5, 2021
May 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
BARTON ST E From LOTTRIDGE ST To LOTTRIDGE ST
Construct Traffic Bump-out in Northwest quadrant of Barton Street & Lottridge Street.
Associated Paving & Materials Ltd.
Aug 3, 2021
Aug 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
Construct Traffic Bump-out in Southeast quadrant of Barton Street East @ Barnesdale Avenue North.
Associated Paving & Materials Ltd.
Aug 3, 2021
Aug 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
Construct traffic signal underground work in preperation for new traffic signal installation.   BP
Decew Construction Inc.
Jul 5, 2021
Jul 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
BARTON ST E From MILTON AVE To MILTON AVE
Construct traffic signal underground work in preperation for new signal installation. - Barton Street & Milton Avenue
Associated Paving & Materials Ltd.
Aug 2021 - Dec 2022
$170,000.00
designservices@hamilton.ca
Map
UPPER WENTWORTH ST From EAST 24TH ST To EAST 24TH ST
Construct Traffic Signal Underground: East 24th & Upper Wentworth - In preperation for installation of an IPS (Intersection Pedestrian Signal).
Decew Construction Inc.
Jul 5, 2021
May 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
Construct traffic signal underground infrastructure in preparation for installation of a full traffic signal at the intersection of Fennell Avenue & Plaza Entrance approx. 50m West of East 43rd Street.  Estimated construction to take place in summer of 2022. 
Decew Construction Inc.
Aug 2022 - Dec 2022
designservices@hamilton.ca
Map
KING ST E From KENILWORTH AC To KENILWORTH AC
Construct traffic signal underground in preperation of a full signal installation at King Street East & Kenilworth Ave South (Northbound Off-Ramp). 
Decew Construction Inc.
Aug 3, 2021
Aug 2022 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
Construct Traffic Signal Underground: Queensdale Avenue & Upper James
Decew Construction Inc.
Jul 5, 2021
Jun 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
Construct Traffic Signal Underground: Queenston Rd & Kenora/Greenford (Signal Modernization)
Decew Construction Inc.
Aug 1, 2022
Aug 2022 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
RYMAL RD E From ARROWHEAD DR To ARROWHEAD DR
Construct traffic signal underground work in preperation for new signal installation. - Rymal Road & Arrowhead Drive
Decew Construction Inc.
Jul 5, 2021
May 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
SOUTH SERVICE RD (Vince Mazza Way)
Construct traffic signal underground work in preperation for new signal installtion.
Decew Construction Inc.
Aug 2022 - Dec 2022
designservices@hamilton.ca
Map
Convert Existing Peestrian Crossover (PXO) to an Intersection Pedestrian Signal (IPS)
Decew Construction Inc.
Jul 5, 2021
May 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
WENTWORTH ST N From CANNON ST E To BRISTOL ST (150m North of Cannon)
Construct Traffic Signal Underground: Wentworth Street & 150m North of Cannon Street - In preperation for installation of an IPS (Intersection Pedestrian Signal).
Associated Paving & Materials Ltd.
Aug 3, 2021
Aug 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
Construct Traffic Signal Underground: Wentworth Street & King William (near Cathedral High School) (IPS)
Associated Paving & Materials Ltd.
Aug 3, 2021
Aug 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
Road rehabilitation
Sanitary Sewer Replacement
$3,461,500.00
designservices@hamilton.ca
Map
DICKENSON RD E (UPPER JAMES ST TO MILES RD)
Project Objective:To provide external servicing to the airport lands as per Citywide Water/Wastewater Master Plan.
Road resurfacing
Trunk Sewer Construction
Water System Improvements
Technicore
Jul 2022 - Nov 2026
$114,127,000.00
designservices@hamilton.ca
Map
Road resurfacing
Coco Paving Inc
Jul 11, 2022
Aug 26, 2022
$865,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Construction of new roadway
Terrain Excavation
Jun 2022 - Apr 2025
$658,670.00
designservices@hamilton.ca
Map
GARNER RD E To SOUTHCOTE RD (Garner rd - Southcote to Wilson)
Road restoration
New Trunk Watermain Installation
$34,356,000.00
designservices@hamilton.ca
Map
Road reconstruction
Catch Basin Repair
$1,107,000.00
designservices@hamilton.ca
Map
Road resurfacing
Green Infrastructure Partners Inc. (GIP)
Nov 2022 - Sep 2023
$2,186,000.00
designservices@hamilton.ca
Map
Road resurfacing
Green Infrastructure Partners Inc. (GIP)
Nov 2022 - Sep 2023
$941,000.00
designservices@hamilton.ca
Map
MILLEN RD (Shoreview Place & Millen Road (100m North of access to North Service Road). Existing curb drops on the bend currently used as access to beachfront lookout point. )
Install Pedestrian Crossover (PXO): Shoreview Place & Millen Road (100m North of North Service Rd & Millen Rd intersection) This crossing is located near the front entrance to Seasons Retirenment Community Building, currently used as access to the beachfront lookout.
Associated Paving & Materials Ltd.
Aug 3, 2021
Aug 2021 - Dec 2022
$20,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Intersection Pedestrian Signal Installation: Stone Church & Chesley Street  
Decew Construction Inc.
Jul 5, 2021
May 2021 - Dec 2022
constructionservices@hamilton.ca
Customer Survey
Map
Internal spot repairs to the combined sewer on Inverness Ave East
May 24, 2021
May 2022 - Jul 2022
$290,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road and sidewalk reconstruction
Sewer lateral replacement
Storm Sewer Installation
Water Distribution System Replacement
$2,027,500.00
designservices@hamilton.ca
Map
Road reconstruction
Sanitary Sewer Service Line Replacement
Water Distribution System Replacement
Wesroc Construction Ltd.
Jun 6, 2022
Aug 25, 2022
$431,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Rockfall Drapery Mesh Installation
$919,000.00
designservices@hamilton.ca
Map
Traffic improvements and associated road resurfacing
Rankin Construction Inc.
May 24, 2022
Sep 30, 2022
$1,287,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road resurfacing
Coco Paving Inc
Sep 15, 2022
Nov 25, 2022
$1,582,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road resurfacing
Coco Paving Inc
Apr 2023 - Jul 2023
$652,000.00
designservices@hamilton.ca
Map
Large Valve Installation
$400,000.00
designservices@hamilton.ca
Map
Large Valve Replacement
$750,000.00
designservices@hamilton.ca
Map
Large Valve Replacement
Deso Construction
Mar 2023 - Oct 2023
$2,134,000.00
designservices@hamilton.ca
Map
LARGE VALVE REPLACEMENT
$2,000,000.00
designservices@hamilton.ca
Map
Large Valve Replacements
Wesroc Construction Ltd.
Aug 29, 2022
Jan 23, 2023
$516,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road resurfacing
KING Paving & Construction (KPM Industries Ltd.)
Jun 20, 2022
Aug 31, 2022
$735,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road and sidewalk reconstruction
Sanitary Sewer Service Line Replacement & Separation
Water System Distribution Replacement
$2,520,000.00
designservices@hamilton.ca
Map
Road resurfacing and pedestrian facility enhancements
Water Distribution Sytem Improvement
$59,024.00
designservices@hamilton.ca
Map
MUD ST W From PARAMOUNT DR To UPPER CENTENNIAL PY
Road rehabilitation
Storm Sewer Replacement
Associated Paving & Materials Ltd.
Jul 18, 2022
Nov 15, 2022
$2,550,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Reconstruction and urbanization
Sanitary Sewer Upgrades
Storm Sewer Installation
$9,470,000.00
designservices@hamilton.ca
Map
Outfall replacement
$700,000.00
designservices@hamilton.ca
Map
2022 Preventative Maintenance (Surface Treatment) Program
Cornell Construction
Jun 24, 2022
Sep 30, 2022
$2,250,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Culvert Replacement
Coco Paving Inc
Aug 15, 2022
Nov 30, 2022
$1,376,000.00
constructionservices@hamilton.ca
Customer Survey
Map
CSP Culvert & Retaining Wall Replacement
$350,000.00
designservices@hamilton.ca
Map
Retaining Wall Replacement
$380,000.00
designservices@hamilton.ca
Map
Retaining Wall Rehabilitation
Eyeco Inc.
Aug 24, 2022
Aug 2022 - Nov 2022
$682,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road resurfacing
Coco Paving Inc
Oct 11, 2022
Oct 24, 2022
$306,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Major Trunk Sewer Rehabilitation
Insituform Technologies
Jun 2023 - Jun 2021
$8,880,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road reconstruction
$5,220,000.00
designservices@hamilton.ca
Map
Road resurfacing
Sewer Service Line Replacement
Water Distribution System Improvement (LRT Enabling Project)
$4,116,000.00
designservices@hamilton.ca
Map
Replace Culvert ANC-776
Road rehabilitation
Coco Paving Inc
Aug 2, 2022
Sep 2, 2022
$602,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Road reconstruction, urbanization and widening
Storm Water Upgrades
Watermain Distribution Extension
Coco Paving Inc
Oct 2022 - Aug 2024
$14,916,000.00
designservices@hamilton.ca
Map
Sight line road improvements
Rankin Construction Inc.
Oct 26, 2022
Nov 16, 2022
$250,000.00
constructionservices@hamilton.ca
Customer Survey
Map
Structural Watermain Lining
Fer-Pal Construction
Apr 7, 2022
Sep 1, 2022
constructionservices@hamilton.ca
Customer Survey
Map
Watermain Structural Lining
Fer-Pal Construction
Mar 14, 2022
Sep 1, 2022
constructionservices@hamilton.ca
Customer Survey
Map
Watermain Structural Lining
Apr 2022 - Nov 2022
constructionservices@hamilton.ca
Customer Survey
Map
Structural Watermain Lining
Fer-Pal Construction
Mar 21, 2022
Sep 1, 2022
constructionservices@hamilton.ca
Customer Survey
Map
Structural Watermain Lining
Fer-Pal Construction
Mar 14, 2022
Sep 1, 2022
constructionservices@hamilton.ca
Customer Survey
Map
Hamilton Water Watermain Lining Priority
Feb 2023 - Nov 2023
constructionservices@hamilton.ca
Customer Survey
Map
Hamilton Water Watermain Lining Priority
Feb 2023 - Nov 2023
constructionservices@hamilton.ca
Customer Survey
Map
Watermain Structural Lining: SENSITIVE CROSSING
Fer-Pal Construction
Feb 22, 2022
Sep 1, 2022
constructionservices@hamilton.ca
Customer Survey
Map
Hamilton Water Watermain Lining Priority
Feb 2023 - Nov 2023
constructionservices@hamilton.ca
Customer Survey
Map
Storm Outfall Rehabilitation
Jan 2023 - Aug 2023
$1,268,000.00
designservices@hamilton.ca
Map
Culvert Replacement
Road resurfacing
Coco Paving Inc
Apr 25, 2022
Oct 14, 2022
$4,250,000.00
constructionservices@hamilton.ca
Customer Survey